Day 3 – PV Panels Installed

The collaboration of Saudi and British Engineers have ensured that the installation of solar PV systems were completed within 48 hours. A large amount of work was carried out in the evening to benefit from cooler weather condition and safer operation with solar panel connections.

This entry was posted in Uncategorised. Bookmark the permalink.